BAM Construction Handed Keys for £60m Diagnostic Centre and Outpatient Wing

9 min read

NEWCASTLE – BAM Construction has been formally handed the keys to begin construction on a vital £60m diagnostic center and outpatient wing in the North East. The expansive multi-storey development is engineered to drastically reduce regional patient waiting lists by integrating high-speed MRI, CT, and X-ray capabilities into a streamlined, high-throughput architectural layout.

BAM's civil and structural engineering teams face the technical challenge of installing extensive lead-lined structural shielding and heavy-duty structural flooring capable of supporting multi-ton medical imaging equipment. The project team will utilize advanced virtual reality and digital twin modeling to stress-test patient flow and operational ergonomics before interior fit-outs begin. This major build guarantees an exceptionally secure, long-term workplace for hundreds of regional contractors and trade specialists, signaling a highly positive era of healthcare infrastructure expansion in the region.

News

9 min read

BAM Construction Handed Keys for £60m Diagnostic Centre and Outpatient Wing

Construction Eye


Our platform highlights the key construction projects from around the UK.

Sign Up

Get insights in your inbox. No spam, just relevant stories.

Copyright © 2026 Construction Eye. All rights reserved.

Construction Eye


Our platform highlights the key construction projects from around the UK.

Sign Up

Get insights in your inbox. No spam, just relevant stories.

Copyright © 2026 Construction Eye. All rights reserved.

Construction Eye


Our platform highlights the key construction projects from around the UK.

Sign Up

Get insights in your inbox. No spam, just relevant stories.

Copyright © 2026 Construction Eye. All rights reserved.